Process Excellence

Process Excellence

How we make the complex repeatable and the repeatable better.

Home/Why Us/Process Excellence

Every record Cemindia has set, every first it has delivered, every project completed ahead of schedule in conditions others declined to attempt, these are not accidents of circumstance. They are the outcomes of a deliberate, continuous investment in the methods, technologies and processes that define how Cemindia works.

Spun pile driving & Installation with drivability analysis.

Spun pile driving & Installation with drivability analysis.

Dahej, Gujarat, 2015
Bi-directional construction of RCC commercial building 
with Top down technique using Bored Pre-cast piles

Bi-directional construction of RCC commercial building with Top down technique using Bored Pre-cast piles

Mumbai, 2015
Elevated track segment construction over operational 
metro line at a record height of 21m above ground level

Elevated track segment construction over operational metro line at a record height of 21m above ground level

DMRC, Delhi, 2014
37.5m of tunneling in a day with installation of 25 rings

37.5m of tunneling in a day with installation of 25 rings

DMRC, Delhi 2009
1.7 Km long tunnel completion using TBM in 152 days

1.7 Km long tunnel completion using TBM in 152 days

DMRC, Delhi 2009
Installation of 211 driven cast in-situ piles in a single day at a site

Installation of 211 driven cast in-situ piles in a single day at a site

Mundra, Kutch 2008
Deep drilling with top hammer in 
drainage gallery under 2m headroom

Deep drilling with top hammer in drainage gallery under 2m headroom

Sripada Yallampalli (A.P.) 2006
Installation of 211 driven cast in-situ piles in a single day at a site

Installation of 211 driven cast in-situ piles in a single day at a site

Mundra, Kutch 2008
Piling Innovation
01
Polymer Slurry for High-Capacity Bored Piles

Polymer Slurry for High-Capacity Bored Piles

Trialled at a restricted-footprint site near Delhi, polymer slurry installation of 1,000mm bored piles returned safe capacities exceeding 750MT against a conventional benchmark of 500MT. A 50% improvement, now standard practice.

02

Special Concrete Mix for Secant Pile Walls

03

Spun Pile Driving & Strength Gain Characterisation

04

Monitoring of Pile Driving with Hydraulic Hammer

Top-Down Construction - Special Adaptations, Mumbai

Top-Down Construction - Special Adaptations, Mumbai

At Wadala, Mumbai, bored precast piles doubled as permanent basement columns with a plate welded at the base to address variable rock levels. A practical adaptation that eliminated significant programme risk on a complex urban site.

Mixed Shield EPB TBM for Mixed Soil and Rock

Mixed Shield EPB TBM for Mixed Soil and Rock

For DMRCi, Cemindia deployed a Mixed Shield EPB TBM through alternating soil and rocky strata, one of the most challenging TBM environments. A capability now embedded across Cemindia's tunnelling methodology.

In-House Stationary Slow Crane for Box Pushing Muck Removal

In-House Stationary Slow Crane for Box Pushing Muck Removal

Fabricated in-house from available winch and structural steel, a stationary slow crane was developed for muck removal at box pushing projects. Built at a fraction of the cost of procured equipment and extended across multiple project sites.

Ground Improvement & Efficiency
Anchor Plates for Pre-Fabricated Vertical Drains - JNPT

Anchor Plates for Pre-Fabricated Vertical Drains - JNPT

Conventional spot-welded anchor plates were failing in field conditions. Cemindia devised a single-piece slitted plate from a tool die. Over 2 lakh PVDs were installed without failure, at 49% less cost than the previous design.

Cement Saving via Polymer Additives for Concrete Pumping

Cement Saving via Polymer Additives for Concrete Pumping

Cemindia is trialling anionic polymer additives to replace cement-sand-water slurry in concrete pump priming creating a lubricating film inside pump lines, reducing friction and eliminating cement cost from the priming process entirely.

Energy & Site Monitoring

01

Real-Time Diesel Generator Monitoring

GEOHEMS software integrated with all CPCB II Compliance Generators across Cemindia's sites which provides real-time data on diesel consumption, targets waste elimination and delivers site-level performance data across the entire generator fleet.

Real-Time Diesel Generator Monitoring

02

LED Lighting Replacement Programme

Phase-by-phase replacement of fluorescent lighting with LED across head office, cabins and depot areas reducing energy consumption in Cemindia's operational footprint as part of a broader commitment to resource efficiency.

LED Lighting Replacement Programme